Ramadan Working Hours 2027 in the UAE: Attendance, Overtime and Rosters

Private-sector hours drop by two hours a day in Ramadan. Here is what the official UAE portal says, and what to change in your attendance calendar, overtime rules and rosters before it starts.

Under the government portal's rule, private-sector working hours in the UAE are reduced by 2 hours every day during Ramadan, so a standard 8-hour day becomes 6. Ramadan working hours UAE 2027 will apply from a start date that is expected in the second week of February 2027 and has not yet been announced. The part that catches employers is not the rule. It is that every late, early-leaving and overtime figure is wrong for a month if the attendance calendar still says 8 hours.

What are the Ramadan working hours in the UAE private sector?

The Official Portal of the UAE Government says private-sector workers are required to work 8 hours per day or 48 hours per week. It then says that during the holy month of Ramadan, working hours are reduced by 2 hours, every day.

Checked on 6 November 2026 against the UAE government portal's page "Working hours and overtime" (u.ae), which showed an update date of 12 August 2026.

Two details are worth reading closely:

MOHRE has announced the reduction for private-sector employees in past years, and you should read the announcement for the year when it is published. This guide does not quote it, because the date and any wording for 2027 do not exist yet.

When does Ramadan 2027 start?

Ramadan 1448 is expected in the second week of February 2027. That is an astronomical expectation, not an announcement. The UAE confirms the start after the moon sighting, usually the evening before.

Checked on 6 November 2026: no official date for the start of Ramadan 2027 has been announced. Plan with a margin of one day either side, and change the calendar only when the date is confirmed. Do not put a date in an employee notice that the authorities have not yet given.

Why does the reduction break attendance figures?

Most attendance rules compare a punch against a fixed day. Lateness is measured from the shift start. Early leaving is measured from the shift end. Overtime is whatever falls after the scheduled hours.

Change the length of the day and all three move. Here is a simple example, with invented numbers:

Neither error shows up as a crash. It shows up in the monthly report, in payroll, and in a conversation with an employee who was told they were short when they were not.

How does overtime work during Ramadan?

The portal's overtime rules do not mention Ramadan. As stated on that page, an employer may ask for overtime provided the extra hours do not exceed 2 hours in one day. Overtime is paid at the normal rate plus 25 percent, and plus 50 percent for overtime between 10 pm and 4 am. Work on an off day earns a substitute rest day or normal pay plus 50 percent.

What changes in practice is the starting line. With a 6-hour Ramadan day, work beyond those 6 hours is the extra time to be measured and approved. Decide in your attendance policy how you treat it, write it down, and apply it to everyone on the same schedule. For the wider rules, see UAE working hours and overtime rules.

If you are unsure how a particular role or contract is treated, ask MOHRE or your legal adviser. Do not guess.

What does a shift roster look like in Ramadan?

The portal states the reduction as a daily figure, so the roster work is arithmetic you can do in advance. Take three invented teams and see what moves.

The common mistake is to shorten the day and forget the coverage. A roster is a promise about who is where, so check the gaps before the month starts, not after the first complaint. For the mechanics of building rosters, see shift scheduling in the UAE.

How do you handle mixed teams and exceptions?

Not every person in a business works the same pattern, and a single company-wide switch can be wrong for someone. Group people by the schedule they actually work: standard day, shifts, part-time, and any role you have been advised is treated differently. Then set the Ramadan hours for each group separately and keep a short note of who confirmed each group's position.

Where you are unsure about a role, the portal page is the starting point, not the end of the question. Confirm with MOHRE or a legal adviser, record the answer, and apply it the same way every year. A written, consistent rule is easier to defend than a decision made person by person in the last week.

What should an employer change before Ramadan?

A short list, in this order:

Eid Al Fitr holidays follow Ramadan, and the same care applies there. See UAE public holidays and rosters.

What should a Ramadan attendance policy say?

Keep it to one page. It should state:

The point of writing it down is to be able to show the same rule to everyone, and to a labour inspector if asked.

What should you check after Ramadan ends?

The month is not over when the last reduced day is. Three checks save a second round of corrections:

Write down what you would do differently, and keep that note with the policy. Next year the dates will change again, and the note turns a scramble into a checklist.

How can Wurxa help with Ramadan hours?

Wurxa's compliance calendar applies Ramadan hours in the attendance engine, so late, early and overtime figures follow the reduced day instead of a spreadsheet you have to remember to edit. Attendance, rosters and overtime read from the same calculation, so the monthly report and the screen next to it agree.

Because the start date is not fixed until it is announced, keep an eye on the confirmed date and check the first week of figures. See Wurxa Attendance and workforce management. Plans are on the pricing page.

If you want help setting the Ramadan period for your own team, ask Sara on wurxa.com or message us.

In Wurxa, just ask Rafe

“Who is late today?”

Rafe answers from today's punches and each person's shift. Rafe is the AI assistant inside Wurxa, in English or Arabic.

Put the workflow into practice.

Start with every Wurxa feature for 14 days. No credit card required.

Start free trial

Frequently asked questions

How many hours is the Ramadan working day in the UAE private sector?

The UAE government portal says private-sector workers normally work 8 hours a day or 48 hours a week, and that during Ramadan the hours are reduced by 2 hours every day. For a standard 8-hour day that means 6 hours.

Does the Ramadan reduction apply to every worker?

The portal states the reduction for private-sector workers in general and does not list exceptions on that page. If your business runs shifts that do not follow a standard day, confirm the position for your roles in the year's MOHRE announcement before you set the calendar.

Is overtime paid differently in Ramadan?

The portal's overtime rules do not mention Ramadan. They say overtime may not exceed 2 extra hours in a day, and is paid at the normal rate plus 25 percent, or plus 50 percent between 10 pm and 4 am. Your system needs to measure overtime against the reduced day, so the extra hours count from the right starting point.

When does Ramadan start in 2027?

Ramadan 1448 is expected in the second week of February 2027, but it has not been announced. The UAE confirms the start after the moon sighting, so treat any date before that as a forecast and plan for a one-day margin.

What is the first thing to change in an attendance system for Ramadan?

The working-day length for the Ramadan period, because late arrival, early leaving and overtime are all measured against it. Leave it at 8 hours and every correct 6-hour day looks like 2 hours short.

Sources

Do this in Wurxa